Dexus – Suite X: Commercial Electrical Fitout

Our Project Team successfully completed the Commercial Fitout to Level 7, 44 Market Street.

Suite X is an innovative co-working model where a whole floor has been converted into 10 flexible suites offering both short to mid-term leases.

Project Specifics

This was a back-to-base installation across two levels of Sydney Central Tower, it was completed over two separate stages with each floor taking 4 months to complete and cover 2,400 sqm each.

Rotric undertook the Base Building House Electrical Installation, utilising the Gripple Wire suspension kits for the exposed cable trays giving it a pleasant finish.

Project Scope of Supply

  • Disconnection, make safe & removal of redundant services
  • Temporary power & lighting services
  • Specified Lighting
  • C-Bus lighting control system
  • Non-monitored exit and emergency lighting system
  • New Private metering
  • General Power and dedicated circuits
  • New Siemon Cat6A Structured cabling system.
  • Cable containment as required
  • 40A 3phase mechanical submains between Level 7 and Level 13
  • As built documentation