Sydney Central – Pitt Street Office Electrical Fit Out Works

Sydney Central, Pitt Street

Our Project Team successfully completed the back-to-base works to Level 4 and Level 7 of Sydney Central Tower.

Sydney Central at 477 Pitt Street is an A-Grade Office Tower in the Haymarket precinct of the CBD, showcasing 32 levels of prime office space and two levels of retail.

Project Specifics

This was a back-to-base installation across two levels of Sydney Central Tower, it was completed over two separate stages with each floor taking 4 months to complete and cover 2,400 sqm each.

Rotric undertook the Base Building House Electrical Installation, utilising the Gripple Wire suspension kits for the exposed cable trays giving it a pleasant finish.

Project Scope of Supply

  • Disconnection & removal of redundant services
  • Temporary power & lighting services
  • New specified Lighting
  • General Power
  • Blind Power & Control Cabling
  • C-Bus lighting control system house areas
  • New House & Tenant distribution boards to both north and south ends of the floor
  • Supply authority CT metering
  • Zoneworks monitored exit & emergency lighting system
  • Backbone cabling to Building Management Office on B2 including network switch
  • Cable Containment – New Powder coated cable tray with Gripple wire stainless steel supports
  • Testing & commissioning
  • System integration as per documentation
  • As built documentation
Scroll to Top